Alder Bend side-channel reconnectionCedar Ridge Conservancy
2023 – 2025
Reopened 2.4 km of abandoned side channel on a working ranch reach, negotiated across four adjacent landowners and a seasonal irrigation withdrawal.
- Built the funding stack from three restoration grants and one habitat-mitigation agreement, then carried it through a single consolidated permit review.
- Reworked the design mid-permitting after spring survey showed the historic alignment had migrated, saving the construction window.
- Left the conservancy a five-year monitoring protocol their seasonal crew can run without a consultant.
Millrace floodplain buy-out and setback leveeHarrowgate Regional Water District
2021 – 2023
Program lead for a voluntary relocation and levee-setback scheme on a repeatedly flooded urban fringe, delivered alongside a neighbourhood advisory group that met monthly for two years.
- Translated hydraulic modelling into plain-language flood scenarios that residents used to compare relocation options themselves.
- Coordinated demolition, soil remediation and planting sequencing so the reclaimed floodplain was walkable within one season.
- Wrote the district's first internal standard for post-project public reporting.
Kestrel Creek culvert replacement seriesNorthvale County Public Works
2019 – 2021
Prioritised and replaced eleven undersized crossings on a single tributary network, sequenced so each construction season opened continuous upstream habitat rather than isolated fragments.
- Developed the scoring model that ranked crossings by passage gain, failure risk and road criticality; the county still uses it.
- Standardised three crossing templates, cutting design time on later sites to a fraction of the first.